Our Clients Say:

  • Steve Earle

    Thermal Transfer (Northern) Ltd, Glossop

    We're always delighted to work with APS, and have enjoyed the benefit of Duncan's considerable expertise for many years now. Our work involves a lot of potentially disruptive break-ins and modifications, and we need to work with someone who can fit around a given schedule which often involves an...

  • Mike Roberts

    Bailey Maintenance Services, Warrington

    We first worked with APS about six years ago, and now we use them for all our pipefreezing requirements. Duncan's incredibly versatile, and always willing to help in whatever capacity he can. Despite his vast knowledge of engineering and plumbing issues, he's not above mucking in with the team to make...

  • Bill Haven

    Manchester Metropolitan University

    We often need to isolate sections of pipe work either in an emergency, or for routine maintenance, and that's where Duncan comes in. We first came across APS via one of our main contractors, and they've now become an invaluable resource for us. We can always count on Duncan to provide a quick response, sensible...

Read More
Keep up to date with Allied Pipefreezing Services ...
Enter your e-mail to receive our FREE eBulletin.
Add Remove

FOLLOW US

Follow Us on Facebook Follow Us on Twitter Follow Us on Wordpress

LineStopping

Client 1.

A large electronics manufacturer was preparing for a full survey of all it's compressed air lines and servicing of all their air receivers. One line was suffering from leaking diaphragm valves. In order to change the diaphragms, it would have needed a full shutdown of the entire compressed air system. This was not an option!

After much consideration the client decided that LineStopping was the best solution. Allied PipeFreezing Services arrived on site and installed two bespoke bolt-on clamps to a 15 meter section of 4" pipe, and set a 1.5" flexile ByPass hose between the two LineStops. The two valves were stripped, cleaned and re-assembled with new diaphragms. The LineStops were removed and the clamps plugged and capped.

The complete operation was comfortably carried out during one shift with no disruption or interuption to the manufacturing throughput.

Client 2.

Bypass and linestops heads in operation

The National Health Service was experiencing problems with an isolation valve which was seized open on a mains cold water line which was passing badly

In order to maintain the water supply two 2.5" LineStops were carried out with a ByPass, this allowed the engineers to remove the faulty gate valve and replace it with a new butterfly valve and a short spool piece, while all the time maintaining an uninterrupted water supply to the hospital. The system was brought back on line with no disruption to the day-to-day operations.

The picture to the right shows the Bypass in operation The picture below shows the faulty valve after removal.

Faulty Valve removed